Tunnel Version - Excavator Drill & Split Machine for Horizontal Rock Breaking

Tunnel-specific version with a horizontal-angle head and a longer feed for face drilling in confined headings. Same non-explosive cycle - drill, split, repeat - giving a clean profile, low vibration and no blasting permit. Configured to your carrier and tunnel cross-section before production.

$16,000 – $28,000 per unit · FOB Guangzhou
MOQ
1
Lead time
25–45 days
Warranty
12 months
Weight
1350 kg
Indicative FOB Guangzhou price. Final price depends on quantity, quality grade and shipping terms.

Quality: Brand new

Video

Video of this unit

Filmed in our yard before shipping - the actual part, not a stock clip. Hosted at 480p.

Tunnel Version - Horizontal Face Drilling

Tunnel Version - Horizontal Angle, Second Pass

All clips from the yard ›

Fits these machines

BrandModelNote
UniversalTunnel headingVerify serial range
Universal20–40 t excavatorVerify serial range

Specifications

ApplicationTunnel face, horizontal angle operation
MethodDrill + hydraulic split, no explosives
FeedLonger feed for confined headings
ConfigBuilt to your carrier and section
Weight1350 kg
Packing190 × 125 × 135 cm, wooden crate
Warranty12 months

Shipping to your market

DestinationModeTransitIndicative
Tashkent, UZ / ТашкентRail + truck15–25 daysfrom $2.9/kg
Almaty, KZ / АлматыRail + truck12–22 daysfrom $2.6/kg
Lagos, NG / ЛагосSea LCL32–45 daysfrom $95/CBM
Nairobi, KE / НайробиSea LCL28–38 daysfrom $110/CBM
Rotterdam, NL / РоттердамSea LCL30–40 daysfrom $85/CBM

Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.

FAQ

How do I confirm this fits my machine?

Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.

What is included in the warranty?

12 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.

How do I pay?

30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.

How is it shipped?

LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.

Get a price for this part

Send the machine model and quantity. You get a quote with shipping cost to your city within 24 hours.

Your inquiry goes straight to our inbox - we reply within 24 hours (usually much faster on WhatsApp or Telegram).

Related parts