Compatible for Komatsu PC300-8 / PC350-8 - Engine Assembly (SAA6D114E)

SAA6D114E-3

SAA6D114E engine assembly for Komatsu PC300-8 / PC350-8. Fits the machine without modification; harness, mounts and injection system matched to the serial range. Rebuilt with new liners and bearings, run-in tested and video-recorded.

$10,700 – $15,600 per unit · FOB Guangzhou
MOQ
1
Lead time
20–35 days
Warranty
6 months
Weight
900 kg
⚠ Not offered for EU placement — non-road engines require Stage V (EU 2016/1628) type approval. We supply this line to Central Asia and Africa only.
Indicative FOB Guangzhou price. Final price depends on quantity, quality grade and shipping terms.

Quality: Remanufactured · Brand new on request

Fits these machines

BrandModelNote
KomatsuPC300-8Verify serial range
KomatsuPC350-8Verify serial range
KomatsuSAA6D114E-3Verify serial range

Specifications

ModelSAA6D114E-3, 6-cylinder
FitsPC300-8 / PC350-8, confirm serial
TestRun-in + compression report
EU noteNot offered - Stage V type approval required
Weight900 kg
Packing180 × 120 × 150 cm, wooden crate
Warranty6 months

Shipping to your market

DestinationModeTransitIndicative
Tashkent, UZ / ТашкентRail + truck15–25 daysfrom $2.9/kg
Almaty, KZ / АлматыRail + truck12–22 daysfrom $2.6/kg
Lagos, NG / ЛагосSea LCL32–45 daysfrom $95/CBM
Nairobi, KE / НайробиSea LCL28–38 daysfrom $110/CBM
Rotterdam, NL / РоттердамSea LCL30–40 daysfrom $85/CBM

Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.

FAQ

How do I confirm this fits my machine?

Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.

What is included in the warranty?

6 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.

How do I pay?

30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.

How is it shipped?

LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.

Get a price for this part

Send the machine model and quantity. You get a quote with shipping cost to your city within 24 hours.

Your inquiry goes straight to our inbox - we reply within 24 hours (usually much faster on WhatsApp or Telegram).

Related parts